The photographs on this page come from 2 sources. Most of them from the industry photo archive archive.strana-rosatom.ru; these are listed below with the photographer, the rights holder and a link to the archive record. A few items come from other rights holders and are credited directly beneath the photograph in the article - they are listed at the end of this page.
The “Strana Rosatom” archive - 27 photographs
The English description follows the archive record; the original wording and the link to the record are under “+”.

Novosibirsk Chemical Concentrates Plant
Pellet sintering operation in BTU furnaces. Photo: NCCP
Copyright ПАО «НЗХК» (NCCP)
Original description and archive record
In the archive: „Новосибирский завод химконцентратов. Операция спекания таблеток в печах BTU. Фото: НЗХК”

Leningrad NPP-2
Turbine of power unit 1 at Leningrad NPP-2. Photo: LNPP
Copyright Ленинградская АЭС (Leningradskaja AES)
Original description and archive record
In the archive: „Ленинградская АЭС-2. Турбина энергоблока № 1 Ленинградской АЭС-2. Фото: ЛАЭС”

Fuel loading
Copyright Ростовская АЭС (Rostowskaja AES)
Original description and archive record

Petrozavodskmash
Main circulation pipelines (MCP)
Photographer Михаил Проскалов (Mikhail Proskalov)
Copyright «Петрозаводскмаш» (Petrozavodskmash)
Original description and archive record
In the archive: „Петрозаводскмаш. Главные циркуляционные трубопроводы (ГЦТ)”

VVER-TOI for Kursk NPP-2
Start of forging a 235-tonne special-steel ingot for a reactor vessel. AEM-Spetsstal, 26 March 2026
Photographer Евгений Ворошилов (Yevgeny Voroshilov)
Copyright Газета «Страна Росатом» (gazeta „Strana Rosatom”)
Original description and archive record
In the archive: „ВВЭР-ТОИ для Курской АЭС-2. 26 марта 2026 года на заводе «АЭМ-Спецсталь» стартовало изготовление новейшего реактора ВВЭР-ТОИ для третьего энергоблока Курской АЭС-2”

Akkuyu NPP
Installation of the fourth tier of the containment on unit 3 under construction at Akkuyu NPP in Turkey, 20 October 2023.
Copyright АО «Аккую Нуклеар» (Akkuyu Nükleer)
Original description and archive record
In the archive: „АЭС «Аккую». Монтаж четвертого яруса защитной оболочки на строящемся блоке № 3 АЭС «Аккую» в Турции, 20 октября 2023 г.”

VVER-1200 steam generator vessel
Photographer Алексей Башкиров (Aleksiej Baszkirow)
Copyright Газета «Страна Росатом» (gazeta „Strana Rosatom”)
Original description and archive record

Assembly of reactor internals
Photographer Евгений Лядов (Jewgienij Ladow)
Copyright «АЭМ-технологии» (AEM-Technologies)
Original description and archive record

Inside the reactor vessel - Atommash
Surfaces of the in-vessel components of the reactor vessel.
Photographer Андрей Радченко (Andriej Radczenko)
Copyright «АЭМ-технологии» (AEM-Technologies)
Original description and archive record
In the archive: «Атоммаш». Красота поверхностей внутрикорпусных устройств корпуса реактора.

Heat exchanger tube bundles - ZiO-Podolsk
Hall of the «ЗиО-Подольск» machine works, Podolsk, Moscow region.
Copyright «ЗиО-Подольск» (ZiO-Podolsk)
Original description and archive record
In the archive: Машиностроительный завод «ЗиО-Подольск», Подольск, Московская область.

Manufacture of reactor equipment - «АЭМ-Спецсталь»
The manufacture of reactor equipment at the «АЭМ-Спецсталь» plant in Kolpino. April 2024.
Photographer Евгений Ворошилов (Yevgeny Voroshilov)
Copyright Газета «Страна Росатом» (gazeta „Strana Rosatom”)
Original description and archive record
In the archive: Процесс производства реакторного оборудования на площадке «АЭМ-Спецсталь» (машиностроительный дивизион «Росатома») в Колпино. Апрель 2024 года.

Manufacture of the VVER-1200 reactor for Akkuyu NPP
Copyright ООО «Росатом Машиностроение» (Rosatom Maszinostrojenije)
Original description and archive record
In the archive: „Производство реактора ВВЭР-1200 для АЭС «Аккую»” - karta nie zawiera opisu.

Rooppur NPP
Loading of fuel assembly simulators has begun at power unit 1 of Rooppur NPP. A total of 163 simulators will be installed. Bangladesh, 16 September 2024
Photographer Никита Грейдин (Nikita Grejdin)
Copyright АО «АСЭ» (ASE / Atomstrojeksport)
Original description and archive record
In the archive: „АЭС «Руппур». На первом энергоблоке АЭС «Руппур» начали загружать имитаторы тепловыделяющих сборок. Всего будут размещены 163 ИТВС. Бангладеш, 16 сентября 2024 года”

Assembly of low-pressure rotors - Rooppur NPP
Assembly of low-pressure rotors at unit 1 of the Rooppur nuclear power plant. Bangladesh, August 2023.
Photographer Никита Грейдин (Nikita Grejdin)
Copyright АО «АСЭ» (ASE JSC)
Original description and archive record
In the archive: Монтаж роторов низкого давления на энергоблоке №1. Бангладеш, август 2023 года.

Shipment of the VVER-1200 reactor vessel
Shipment of a VVER-1200 reactor vessel from the Atommash plant for the Rooppur nuclear power plant in Bangladesh. Volgodonsk, 27 April 2021.
Photographer Евгений Лядов (Jewgienij Ladow)
Copyright «АЭМ-технологии» (AEM Technologies)
Original description and archive record
In the archive: Отгрузка корпуса реактора ВВЭР-1200 на заводе «Атоммаш» для АЭС «Руппур» в Бангладеш. Волгодонск, 27 апреля 2021 г.

Assembly of the passive core flooding system
Assembly of the passive core flooding system at the Petrozavodskmash plant.
Photographer Сергей Татарских (Siergiej Tatarskich)
Copyright «Петрозаводскмаш» (Petrozavodskmash)
Original description and archive record
In the archive: Сборка системы пассивного залива активной зоны (СПЗАЗ).

Manufacture of reactor equipment - AEM-Spetsstal
The manufacture of reactor equipment at the AEM-Spetsstal plant in Kolpino. April 2024.
Photographer Евгений Ворошилов (Yevgeny Voroshilov)
Copyright Газета «Страна Росатом» (gazeta „Strana Rosatom”)
Original description and archive record
In the archive: Процесс производства реакторного оборудования на площадке «АЭМ-Спецсталь» в Колпино. Апрель 2024 года.

Transport airlock of unit 2, Rooppur NPP
The transport airlock for unit 2 of the Rooppur nuclear power plant was delivered to the installation area; the operation took 7 hours. Bangladesh, 26 August 2024.
Photographer Никита Грейдин (Nikita Grejdin)
Copyright АО «АСЭ» (ASE JSC)
Original description and archive record
In the archive: Транспортный шлюз для второго энергоблока АЭС «Руппур» доставили в зону монтажа. Операция заняла семь часов. Бангладеш, 26 августа 2024 года.

Steam generator shells
Steam generator shells at the Petrozavodskmash plant.
Photographer Иван Сорокин (Iwan Sorokin)
Copyright «Петрозаводскмаш» (Petrozavodskmash)
Original description and archive record
In the archive: Обечайки парогенератора.

Pressing the reactor vessel bottom head - Akkuyu NPP
Pressing the reactor vessel bottom head for the Turkish Akkuyu nuclear power plant. Volgodonsk, Atommash, 2019.
Photographer Евгений Лядов (Jewgienij Ladow)
Copyright «АЭМ-технологии» (AEM Technologies)
Original description and archive record
In the archive: Штамповка днища реактора для Турецкой АЭС «Аккую». Волгодонск, «Атоммаш», 2019 г.

A set of PGV-1000 steam generators
A set of PGV-1000 steam generators for unit 2 of the Belarusian nuclear power plant. Volgodonsk, Atommash, 2016.
Photographer Евгений Лядов (Jewgienij Ladow)
Copyright «АЭМ-технологии» (AEM Technologies)
Original description and archive record
In the archive: Комплект парогенераторов ПГВ-1000 для 2 энергоблока Белорусской АЭС. Волгодонск, «Атоммаш», 2016 г.

Assembly of a fuel assembly skeleton
Assembly of a fuel assembly skeleton at the Novosibirsk Chemical Concentrates Plant.
Photographer ПАО «НЗХК» (PJSC NZChK)
Copyright ПАО «НЗХК» (PJSC NZChK)

Steam generator coils
Steam generator coils. Volgodonsk, Atommash, 2014.
Photographer Иван Сорокин (Iwan Sorokin)
Copyright «АЭМ-технологии» (AEM Technologies)
Original description and archive record
In the archive: Змеевики парогенератора. Волгодонск, «Атоммаш», 2014 г.

Passive heat removal system - unit 2, Rooppur NPP
A passive heat removal system has been installed at unit 2 of the Rooppur nuclear power plant. Bangladesh, 24 - 25 January 2024.
Photographer Никита Грейдин (Nikita Grejdin)
Copyright АО «АСЭ» (ASE JSC)
Original description and archive record
In the archive: На энергоблоке № 2 АЭС «Руппур» смонтировали систему пассивного отвода тепла. Бангладеш, 24 - 25 января 2024 г.

Hafnium pellet
Hafnium pellet - Chepetsk Mechanical Plant.
Copyright АО «ТВЭЛ» (JSC TVEL)

Machining the inner surface of a reactor vessel half-shell
Bench machining of the inner surface of a reactor vessel half-shell. Atommash plant.
Photographer Сергей Татарских (Siergiej Tatarskich)
Copyright «АЭМ-технологии» (AEM Technologies)
Original description and archive record
In the archive: Слесарная зачистка внутренней поверхности полукорпуса реактора.

Construction of the Akkuyu nuclear power plant
The construction site of the Akkuyu nuclear power plant in Turkey. Photograph from 2022 - 2023.
Copyright АО «Аккую Нуклеар» (Akkuyu Nuclear JSC)
Original description and archive record
In the archive: АЭС «Аккую», 2022-2023.

Construction of the Akkuyu nuclear power plant
The construction site of the Akkuyu nuclear power plant in Turkey, with grass in the foreground. Photograph from 2022 - 2023.
Copyright АО «Аккую Нуклеар» (Akkuyu Nuclear JSC)
Original description and archive record
In the archive: АЭС «Аккую», 2022-2023.
Other materials
Photographs and graphics from outside the archive. Each is also credited where it appears.
- Indicative visualisation of the first nuclear power plant in Poland - Source: Polskie Elektrownie Jądrowe. Used in the article Poland's first nuclear power plant - what has been done and when it starts, with a credit beneath the photograph.
- Portrait photograph - own material.
- The logo, article banners and explanatory graphics - own materials, produced for this website.
- Screenshots of standards pages - extracts from the ISO and PKN websites, used for information in the article about ISO 19443.
